Advertisement

Ad promo image large
  • Published Date

    August 20, 2020
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

Beale Air Force Base Proposed Interconnection Line Project Revised Draft Environmental Assessment for Review Western Area Power Administration (WAPA), a Send us your comments power marketing administration in the U.S. De- Send or email your comments to: partment of Energy, is seeking public input on a Revised Draft Environmental Assessment (EA) Tish Saare, NEPA Project Manager prepared for a new 5-mile 230/60-kilovolt inter- Western Area Power Administration connection line with Beale Air Force Base (AFB). 114 Parkshore Drive The project included two previous rounds of pub- Folsom, California 95630 lic scoping, initially in December 2017 and January Email: Saare@WAPA.gov 2018, and again when a third alternative was identi- fied in July 2018. Comments on the Revised Draft EA must be post-marked by September 21, 2020. The Draft EA was jointly prepared by WAPA and Beale AFB to comply with the National Environ- Beale Air Force Base mental Policy Act. The Draft EA was available for Proposed Substation public review from January 2, 2020 to February 3, Northern BAlternative Existing WAPA Line Overhead Line 2020 and from March 18, 2020 to April 17, 2020. - - Underground Line HAMMONTONS WAPA and Beale AFB have revised the Draft EA in response to comments received during the public review period. The Revised Draft EA is ready for public review and comments. Northern AAlternativo NBEALLRD Revised Draft EA availability Southem Atornativo GTH ST The Revised Draft EA, along with comment forms and other project information, is available online at: ERLERD https://go.usa.gov/xU9zz Miles Western Area Power Administration SCEALE RD Beale Air Force Base Proposed Interconnection Line Project Revised Draft Environmental Assessment for Review Western Area Power Administration (WAPA), a Send us your comments power marketing administration in the U.S. De- Send or email your comments to: partment of Energy, is seeking public input on a Revised Draft Environmental Assessment (EA) Tish Saare, NEPA Project Manager prepared for a new 5-mile 230/60-kilovolt inter- Western Area Power Administration connection line with Beale Air Force Base (AFB). 114 Parkshore Drive The project included two previous rounds of pub- Folsom, California 95630 lic scoping, initially in December 2017 and January Email: Saare@WAPA.gov 2018, and again when a third alternative was identi- fied in July 2018. Comments on the Revised Draft EA must be post-marked by September 21, 2020. The Draft EA was jointly prepared by WAPA and Beale AFB to comply with the National Environ- Beale Air Force Base mental Policy Act. The Draft EA was available for Proposed Substation public review from January 2, 2020 to February 3, Northern BAlternative Existing WAPA Line Overhead Line 2020 and from March 18, 2020 to April 17, 2020. - - Underground Line HAMMONTONS WAPA and Beale AFB have revised the Draft EA in response to comments received during the public review period. The Revised Draft EA is ready for public review and comments. Northern AAlternativo NBEALLRD Revised Draft EA availability Southem Atornativo GTH ST The Revised Draft EA, along with comment forms and other project information, is available online at: ERLERD https://go.usa.gov/xU9zz Miles Western Area Power Administration SCEALE RD

OTHER PRINT ADS