Advertisement

Ad promo image large
  • Published Date

    April 30, 2021
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

WARNING - NORTH CHANNEL OF YUBA RIVER CLOSED TO ALL WATERCRAFT FOR HABITAT ENHANCEMENT CONSTRUCTION: DAGUERRE POINT DAM TO 6,000 FT. DOWNSTREAM APRIL 1 TO DECEMBER 1, 2021 Daguerre Point Dam Yuba Goldfields - NORTH CHANNEL CLOSURE AREA AYUBA WATER AGENCY - PROJECT GRADING FOOTPRINT - MATERIAL REMOVAL BRIDGE The Hallwood Side Channel and Floodplain Restoration Project is designed to enhance the lower Yuba River ecosystem by increasing available juvenile salmon habitat to improve the natural production of Chinook salmon and Central Valley steelhead. The project will also reduce flood risk through lower water surface elevations and velocities during flood events. Learn more at YubaWater.org. WARNING - NORTH CHANNEL OF YUBA RIVER CLOSED TO ALL WATERCRAFT FOR HABITAT ENHANCEMENT CONSTRUCTION: DAGUERRE POINT DAM TO 6,000 FT. DOWNSTREAM APRIL 1 TO DECEMBER 1, 2021 Daguerre Point Dam Yuba Goldfields - NORTH CHANNEL CLOSURE AREA AYUBA WATER AGENCY - PROJECT GRADING FOOTPRINT - MATERIAL REMOVAL BRIDGE The Hallwood Side Channel and Floodplain Restoration Project is designed to enhance the lower Yuba River ecosystem by increasing available juvenile salmon habitat to improve the natural production of Chinook salmon and Central Valley steelhead. The project will also reduce flood risk through lower water surface elevations and velocities during flood events. Learn more at YubaWater.org.